HVAC Package Supplier for onshore industries and nuclear power plant with Project Management,
Engineering, Procurement, Manufacturing, Installation and Commissioning services.

(Total 57)

NO PROJECT LOCATION ITEM SCOPE OWNER END USER PROJECT PERIOD
37 Braka Nuclear Power Plant Units 3&4 UAE Air Cleaning Unit : 32 sets, Electric Duct Heater : 32 sets P ENEC KEPCO Finished (2012 ~ 2021)
36 Yanbu_MED Desalination Plant Project SAUDI ARABIA PAC(5RT~20RT) : 11 sets Fan(Smoke, Explosion proof, Wall) : 7 sets Duct & Damper, Bulk, Electric : 1 LOT PC SWCC Doosan Finished (Dec. 2011 ~ 2012)
35 Shuweihat S2 IWPP Project UAE AHU(20RT ~ 65RT) : 14 sets, EUH : 4 sets Roof top unit(7RT) : 1 set, PAC & Split A/C(1RT ~ 3RT) : 6 sets Fan(Wall, Duct in line, Roof) : 34 sets Duct & Damper, Bulk, Electric : 1 LOT PC RUWAIS Power Company Doosan Finished (Apr. 2010 ~ 2011)
34 Piggery Ventilation System development & Supply Korea Fan, Damper, Measuring Assembly P Sunjin Sunjin Ongoing (2021.11 ~ 2027)
33 New PWR Fuel Plant Korea AHU, AIU, FILTRATION UNIT PAC, EHP, FAN, EXPANSION TANK&PRV, PUMP, UNIT HEATER (HOT WATER), ELECTRIC RADIATOR, INVERTER PANEL, V.D, B.D.D, F.D, M.V.D, Access Door P KNF Daewoo E&C Ongoing (2020.10 ~ 2022)
32 Busan Subway Line 2 Project Korea AHU : 28 sets P Busan Transportation Corporation Haegang Tech Finished (2021.05~ 2021.10)
31 Nacelle Cooling System Korea Heat exchanger(Air to Air), Circulation fan, Air Duct P Doosan Doosan Finished (2019.09 ~ 2022)
30 Korea Rare Isotope Accelerator Korea RI FILTER UNIT : 47 sets PC IBS POSCO E&C Finished (2018~2020)
29 Korea Rare Isotope Accelerator Korea Cubicle Cooler : 4 sets PC IBS POSCO E&C Finished (2018~2020)
28 PYEONGTAEK FAB 2 Korea Duct & Damper including Installation PC Samsung electronics SAMSUNG C&T Finished (2018.08 ~ 2019.10)
27 Pure cell system Korea Pure cell 140 sets P Doosan fuel Cell Doosan fuel Cell Ongoing
26 Repository for Low&Intermediate Level Radwaste (2nd Phase) Korea AHU 2SET, ACU 2SET, ACCU 4SET P KORAD KORAD Ongoing (2017~2022)
25 KSLV-II Project Korea AHU 2 sets, ACCU : 12 sets, Split A/C : 7 sets, Fan : 10 sets, Dehumidifier : 10 sets, Duct & Damper, Bulk, Electric : 1 LOT PC KARI HHI Finished (Nov. 2016 ~ May. 2017)
24 Hanbit 3,4 SGR Project Korea AHU : 1 set, ACU : 1 set, FAN : 3 sets, EDU: 3 sets, PACU : 1 set Control Panel : 1 LOT, Instrument : 1 LOT P KHNP Daewoo E&C Finished (May. 2016 ~ May. 2017)
23 Energy Storage Systems (ESS) for Electric Power Demand Management Project Korea RTU(85RT) : 2 Sets, FAN(25,000 CMH ~ 50,000 CMH) : 5 Sets HVAC PANEL(DB, Control) : 1 Set P SK E&S Doosan Finished (2018.06 ~2018)
22 Sin Kori 5&6 Nuclear Power Plant Duct(CP-M4) Korea Duct & Damper Including Installation PC KHNP SAMSUNG C&T Finished (2018~2020)
21 Sin Kori 5&6 Nuclear Power Plant Non-Safety-Related Air Handling Unit & Cubicle Coolers(M253) Korea Non Safety-Related AHU : 31 sets, Cubicle Cooler : 91 sets, Electric Duct Heater : 52 sets, Electric Unit Heater : 181 sets, Packaged Air Conditioning Unit : 26 sets, Air-Cooled Condensing Unit : 33 sets, Gravity Roof Ventilator : 84 sets P KHNP KHNP Ongoing (2016 ~ 2023)
20 Sin Kori 5&6 Nuclear Power Plants Dampers & Ductwork Accessories(M254) Korea Safety-Related Damper(fire, control, manual, blast, GRD) : 1612 sets, Non Safety-Related Damper(fire, control, manual, blast) : 1372 sets, Swing panel : 24sets, Silencer : 8 sets, Humidifier : 15 sets P KHNP KHNP Ongoing (2016 ~ 2023)
19 Sin Kori 5&6 Nuclear Power Plants Non-Safety Related Air Cleaning Units(M255A) Korea Non Safety-Related ACU : 39 sets P KHNP KHNP Ongoing (2016 ~ 2023)
18 Ulchin NPP #3&4 Steam Generator Korea AHU : 1 set, PAC : 1 set, Fan : 3 sets, Damper : 1 LOT P KHNP Daelim Finished (2012)