육상 플랜트 및 원자력 발전소의 안전성 및 비안전성 공조시스템에 대한
설계, 제작 및 시공에 이르기까지 공조시스템의 토탈 솔루션을 제공합니다

(Total 57)

NO PROJECT LOCATION ITEM SCOPE OWNER END USER PROJECT PERIOD
57 OUMACHE III 1,300 MW CCPP Project Algeria AHU: 12sets, ACCU: 12sets, RTU:14sets, ASU:12sets, SAC: 109sets CTHU: 10sets, FAN: 215sets, Control part: 1 Lot, Electric Duct Heater: 10set, Electric Unit Heater: 78sets, Humidifier: 10sets P HYENCO Hyundai E&C Ongoing (2020.10 ~ 2023.05)
56 Algeria Chiller Package Project Algeria Air cooled water Chiller: 2sets, Chilled water pump: 4 sets, Heat Exchanger unit: 4 sets, Expansion tank: 2 sets, Control Part, 4sets P HYENCO Hyundai E&C Ongoing (2021.11 ~ 2022.12)
55 Uzbekistan Gas To Liquid Project Uzbekistan AHU: 19sets, ACCU: 18sets, PU: 6sets, CFU: 9sets, CCU: 12sets, SAC: 73sets, Fan: 166sets, Steam H/E: 15sets, HWDH: 38sets, Electric Duct Humidifier: 5sets, SUH: 112sets, VAV: 17sets, CAV: 18sets, Blast Protection Damper: 15sets, Expansion Tank: 21sets, St P Oltin Yo'l GTL Hyundai Engineering Finished (2018.01 ~ 2019.08)
54 VinhTan 4 Extension Thermal Power Plant Project (600MW) VIETNAM AHU : 4 sets, ACCU : 4 sets, RTU : 4sets, SAC : 16 sets, Fan : 44 sets P EVN Doosan Finished (May. 2017 ~ Mar. 2018)
53 Golon Gas Project PANAMA Packaged Air Conditioner : 8 sets, CTHU : 2 sets, FFU : 4 sets Exhaust Fan(Ex-proof) : 2 sets, Duct & Damper, Bulk, Electric : 1 LOT P AES Posco E&C Finished (Jan. 2017 ~ Aug. 2017)
52 VinhTan 4 Thermal Power Plant Project (600MW x 2) VIETNAM AHU : 4 sets, ACCU : 4 sets, RTU : 4sets, SAC : 108 sets, Fan : 105 sets P EVN Doosan Finished (Jun. 2015 ~ Mar. 2017)
51 Zubair Project(E-house) IRAQ Packaged Air Conditioner(Ex-proof) : 2 sets, Exhaust Fan(Ex-proof) : 4 sets, Exhaust Fan : 1 set EPC ENI Samyang Finished (2016)
50 Satah Al Razboot(SARB) #4 Project(E-HOUSE) UAE Roof Top Unit : 27sets, Chemical Filter Unit : 6sets Blast Damper : 27sets, Pressurization Unit : 3sets EPC ADMA-OPCO Hyundai E&C Finished (2015~2016)
49 Zubair Project(LER 3 building) IRAQ Packaged Air Conditioner : 6 sets, Sand Trap Box : 3 sets, Panel(Power, Control) : 3 sets EPC ENI Samyang Finished (2015~2016)
48 West Qurna CPPB Project IRAQ HVAC SYSTEM (Included Roof top unit : 2sets, PAC : 4sets ) EPC LUKOIL Hyundai Finished (Sep. 2014 ~ Mar. 2015)
47 Clean Fuels Project KUWAIT Roof top unit(20RT~30RT) : 6 sets Chemical filter : 3 sets, Inertial filter /w bleed fan : 3 sets Explosion proof fan : 6 sets, Duct & Damper, Bulk, Electric : 1 LOT EPC KNPC KHAN Finished (Apr. 2014 ~ May. 2015)
46 West Qurna Field 2nd Phase Project IRAQ Roof top unit(20RT~32RT) : 20 sets PAC(10RT) : 9 sets, Inertial filter /w bleed fan : 10 sets Explosion proof fan : 20 sets, Duct & Damper, Bulk, Electric : 1 LOT EPC LUKOIL Hyundai Finished (Jan. 2013~Jun. 2013)
45 IGD DAS Project UAE Damper(Volume Control, Non Return, Pressure Relief, Fire, Gas, Blast, Diffuser, Register, Sound Attenuators, Louver, Sand Trap) : 1 LOT P ADGAS Hyundai Finished (2011 ~ 2012)
44 SHWE field development MYANMAR Roof top unit(8RT ~ 61RT) : 13 sets, PAC & Split A/C(1RT ~ 8RT) : 20 sets, Fan(Wall, Duct in line, Roof) : 67 sets EPC MOGE Hyundai Finished (May. 2010 ~ 2012)
43 RAS DJINET CCPP Project (400MW x 3) ALGERIA P2 Bulk P Sonelgaz SPE Daewoo E&C Finished (Jan. 2014 ~ Oct. 2016)
42 STX NRC Diesel Power Plant Project (7.5MW x 12) IRAQ Air Washer Unit(126,665 CMH, 469kW) : 12 sets P + Supervisor NRC STX Finished (2012)
41 Mong Duong 2_Coal Fired Power Project (560MW x 2) VIETNAM Roof top unit(3RT ~ 86RT) : 44 sets AHU(30~40RT ) : 9 sets PAC & Split A/C(1RT ~ 16RT) : 82 sets, Fan(Wall, Roof, Duct in line, Smoke, Explosion proof) : 290 sets Duct & Damper, Bulk, Electric : 1 LOT EPC AES-VCM Doosan Finished (2012 ~ 2015)
40 Raipur TPP Coal Fired Power Plant Project (685MW x 2) INDIA Chiller Unit(90RT) : 3 sets, AHU(110RT) : 2 sets Air Washer Unit(300,000 CMH) : 8 sets PAC & Split A/C(1RT ~ 40RT) : 44 sets FAN(Wall, Roof, Duct in line) : 122 sets Duct & Damper, Bulk, Electric : 1 LOT EPC GMR Doosan Finished (Apr. 2011 ~ 2015)
39 Jordan Research & Training Reactor Project JORDAN AHU(17RT ~ 69RT) : 6 sets, Chiller Unit(88RT) : 3 sets PAC(5RT ~ 35RT) : 15 sets, Fan : 51 sets Sand Removal Filter : 6 sets, Air Cleaning Unit : 2 sets Filter Train : 28 sets, Hepa Filter Box : 4 sets P JAEC Daewoo E&C Finished (2013)
38 Braka Nuclear Power Plant Units 1&2 UAE Air Cleaning Unit : 32 sets, Electric Duct Heater : 32 sets P ENEC KEPCO Finished (2012 ~ 2021)