(Total 57)
NO | PROJECT | LOCATION | ITEM | SCOPE | OWNER | END USER | PROJECT PERIOD |
---|---|---|---|---|---|---|---|
37 | Braka Nuclear Power Plant Units 3&4 | UAE | Air Cleaning Unit : 32 sets, Electric Duct Heater : 32 sets | P | ENEC | KEPCO | Finished (2012 ~ 2021) |
36 | Yanbu_MED Desalination Plant Project | SAUDI ARABIA | PAC(5RT~20RT) : 11 sets Fan(Smoke, Explosion proof, Wall) : 7 sets Duct & Damper, Bulk, Electric : 1 LOT | PC | SWCC | Doosan | Finished (Dec. 2011 ~ 2012) |
35 | Shuweihat S2 IWPP Project | UAE | AHU(20RT ~ 65RT) : 14 sets, EUH : 4 sets Roof top unit(7RT) : 1 set, PAC & Split A/C(1RT ~ 3RT) : 6 sets Fan(Wall, Duct in line, Roof) : 34 sets Duct & Damper, Bulk, Electric : 1 LOT | PC | RUWAIS Power Company | Doosan | Finished (Apr. 2010 ~ 2011) |
34 | Piggery Ventilation System development & Supply | Korea | Fan, Damper, Measuring Assembly | P | Sunjin | Sunjin | Ongoing (2021.11 ~ 2027) |
33 | New PWR Fuel Plant | Korea | AHU, AIU, FILTRATION UNIT PAC, EHP, FAN, EXPANSION TANK&PRV, PUMP, UNIT HEATER (HOT WATER), ELECTRIC RADIATOR, INVERTER PANEL, V.D, B.D.D, F.D, M.V.D, Access Door | P | KNF | Daewoo E&C | Ongoing (2020.10 ~ 2022) |
32 | Busan Subway Line 2 Project | Korea | AHU : 28 sets | P | Busan Transportation Corporation | Haegang Tech | Finished (2021.05~ 2021.10) |
31 | Nacelle Cooling System | Korea | Heat exchanger(Air to Air), Circulation fan, Air Duct | P | Doosan | Doosan | Finished (2019.09 ~ 2022) |
30 | Korea Rare Isotope Accelerator | Korea | RI FILTER UNIT : 47 sets | PC | IBS | POSCO E&C | Finished (2018~2020) |
29 | Korea Rare Isotope Accelerator | Korea | Cubicle Cooler : 4 sets | PC | IBS | POSCO E&C | Finished (2018~2020) |
28 | PYEONGTAEK FAB 2 | Korea | Duct & Damper including Installation | PC | Samsung electronics | SAMSUNG C&T | Finished (2018.08 ~ 2019.10) |
27 | Pure cell system | Korea | Pure cell 140 sets | P | Doosan fuel Cell | Doosan fuel Cell | Ongoing |
26 | Repository for Low&Intermediate Level Radwaste (2nd Phase) | Korea | AHU 2SET, ACU 2SET, ACCU 4SET | P | KORAD | KORAD | Ongoing (2017~2022) |
25 | KSLV-II Project | Korea | AHU 2 sets, ACCU : 12 sets, Split A/C : 7 sets, Fan : 10 sets, Dehumidifier : 10 sets, Duct & Damper, Bulk, Electric : 1 LOT | PC | KARI | HHI | Finished (Nov. 2016 ~ May. 2017) |
24 | Hanbit 3,4 SGR Project | Korea | AHU : 1 set, ACU : 1 set, FAN : 3 sets, EDU: 3 sets, PACU : 1 set Control Panel : 1 LOT, Instrument : 1 LOT | P | KHNP | Daewoo E&C | Finished (May. 2016 ~ May. 2017) |
23 | Energy Storage Systems (ESS) for Electric Power Demand Management Project | Korea | RTU(85RT) : 2 Sets, FAN(25,000 CMH ~ 50,000 CMH) : 5 Sets HVAC PANEL(DB, Control) : 1 Set | P | SK E&S | Doosan | Finished (2018.06 ~2018) |
22 | Sin Kori 5&6 Nuclear Power Plant Duct(CP-M4) | Korea | Duct & Damper Including Installation | PC | KHNP | SAMSUNG C&T | Finished (2018~2020) |
21 | Sin Kori 5&6 Nuclear Power Plant Non-Safety-Related Air Handling Unit & Cubicle Coolers(M253) | Korea | Non Safety-Related AHU : 31 sets, Cubicle Cooler : 91 sets, Electric Duct Heater : 52 sets, Electric Unit Heater : 181 sets, Packaged Air Conditioning Unit : 26 sets, Air-Cooled Condensing Unit : 33 sets, Gravity Roof Ventilator : 84 sets | P | KHNP | KHNP | Ongoing (2016 ~ 2023) |
20 | Sin Kori 5&6 Nuclear Power Plants Dampers & Ductwork Accessories(M254) | Korea | Safety-Related Damper(fire, control, manual, blast, GRD) : 1612 sets, Non Safety-Related Damper(fire, control, manual, blast) : 1372 sets, Swing panel : 24sets, Silencer : 8 sets, Humidifier : 15 sets | P | KHNP | KHNP | Ongoing (2016 ~ 2023) |
19 | Sin Kori 5&6 Nuclear Power Plants Non-Safety Related Air Cleaning Units(M255A) | Korea | Non Safety-Related ACU : 39 sets | P | KHNP | KHNP | Ongoing (2016 ~ 2023) |
18 | Ulchin NPP #3&4 Steam Generator | Korea | AHU : 1 set, PAC : 1 set, Fan : 3 sets, Damper : 1 LOT | P | KHNP | Daelim | Finished (2012) |