납품실적

육상 플랜트 및 원자력 발전소의 안전성 및 비안전성 공조시스템에 대한
설계, 제작 및 시공에 이르기까지 공조시스템의 토탈 솔루션을 제공합니다

(Total 57)

NO PROJECT LOCATION ITEM SCOPE OWNER END USER PROJECT PERIOD
17 Proton Engineering Frontier Project Korea Chiller Unit : 5 sets, AHU : 8 sets, Cubicle Cooler : 1 set Air Cleaning Unit : 3 sets, PAC : 10 sets, Fan : 51 sets PC KHNP Daewoo E&C Finished (Nov. 2011 ~ 2012)
16 Shin-Ulchin 1&2 Nuclear Power Plants Safety-Related Air Cleaning Units & Duct Heaters(M252) Korea Safety-Related ACU : 16 sets, Safety-Related Electric Duct Heater : 16 sets P KHNP KHNP Finished (2011 ~ 2017)
15 Shin-Ulchin 1&2 Nuclear Power Plants Non-Safety-Related Air Handling Unit & Cubicle Coolers(M253) Korea Non Safety-Related AHU : 34 sets, Cubicle Cooler : 97 sets, Electric Duct Heater : 72 sets, Electric Unit Heater : 203 sets, PACkaged Air Conditioning Unit : 33 sets, Air-Cooled Condensing Unit : 47 sets, Gravity Roof Ventilator : 84 sets P KHNP KHNP Finished (2011 ~ 2019)
14 Shin-Ulchin 1&2 Nuclear Power Plants Dampers & Ductwork Accessories(M254) Korea Safety-Related Damper(fire, control, manual) : 1200 sets, Non Safety-Related Damper(fire, control, manual) : 1400 sets, Swing panel : 24sets, Silencer : 8 sets, Humidifier : 15 sets P KHNP KHNP Finished (2011 ~ 2017)
13 Shin-Ulchin 1&2 Nuclear Power Plants Non-Safety Related Air Cleaning Units(M255A) Korea Non Safety-Related ACU 27 sets, P KHNP KHNP Finished (2011 ~ 2018)
12 Sin Kori 3&4 Nuclear Power Plant #1&2 Non-Safety-Related Air Handling Unit & Cubicle Coolers(M253) Korea Non Safety-Related AHU 31 sets, Cubicle Cooler 67 sets, Electric Duct Heater 62 sets, Electric Unit Heater 168 sets, Packaged Air Conditioning Unit 33 sets, Air-Cooled Condensing Unit 42 sets, Gravity Roof Ventilator 84 sets P KHNP KHNP Finished (2010 ~ 2012)
11 Repository for Low & Intermediate Level Radwaste AIR HANDLING UNITS, HEATERS AND HUMIDIFIERS(M253) Korea Non Safety-Related AHU 9 sets, Cubicle Cooler 67 sets, Electric Duct Heater 18 sets, Electric Unit Heater 23 sets, Packaged Air Conditioning Unit 11 sets, Air-Cooled Condensing Unit 20 sets, Humidifier 1 sets, P KHNP KHNP Finished (2008 ~ 2009)
10 Shinwolsong 1&2 Nuclear Power Plants Non-Safety-Related Air Handling Unit & Cubicle Coolers(M253) Korea Non Safety-Related AHU 28 sets, Cubicle Cooler 67 sets, Electric Duct Heater 62 sets, Electric Unit Heater 168 sets, Packaged Air Conditioning Unit 23 sets, Air-Cooled Condensing Unit 47 sets, Gravity Roof Ventilator 84 sets P KHNP KHNP Finished (2007 ~ 2011)
9 OSAN Combined heat & power plant Project (460MW) Korea AHU : 4 sets, chiller : 1 set, PAC & CTHU :11 sets Fan(Wall, Roof, Duct in line) : 43sets, EHP : 7 sets, Cooling tower : 1 set, Duct & Damper, Bulk, Electric : 1 LOT PC KEPCO KEPCO Finished (Nov. 2014 ~ Dec. 2016)
8 TAEAN POWER UNIT 9,10 Project (1,050MW x 2) Korea AHU : 6 sets, Water chiller : 3 sets, PAC & CTHU : 46 Sets, VAV : 30sets, Fan(Wall, Roof, Duct in line) : 22 sets Steam unit heater : 37 sets, Desuper heater : 2 sets Duct & Damper, Bulk, Electric : 1 LOT PC KOWEPO KOWEPO Finished (May. 2014 ~ Dec. 2016)
7 TAEAN IGCC Project (380MW) Korea AHU : 4 sets, Water chiller : 2 sets, PAC & CTHU : 39 Sets, VAV : 38sets, Fan(Wall, Roof, Duct in line) : 55 sets Steam unit heater : 44 sets, Duct & Damper, Bulk, Electric : 1 LOT PC KOWEPO KOWEPO Finished (May. 2014 ~ Dec. 2016)
6 BUK-PYEONG THERMAL POWER PLANT UNIT 1&2 Project (595MW x 2) Korea AHU : 5sets, chiller : 3sets, Fan(Roof, Wall, Duct in line) : 184 sets CTHU : 52sets, PAC : 15sets, EHP : 56sets Radiator(Electric, steam) : 54sets, Steam Unit Heater : 113sets, VAV : 36 sets, Duct & Damper, Bulk, Electric : 1 LOT PC STX & DAERIM STX Finished (Feb. 2014 ~ Oct. 2017)
5 SAMCHEOK GREEN POWER UNIT 1,2 (1,000MW x 2) Korea AHU&ACCU : 3 sets, PAC & CTHU : 34 Sets Fan(Wall, Roof, Duct in line) : 37 sets Steam unit heater : 36 sets, Desuper heater : 2 sets Duct & Damper, Bulk, Electric : 1 LOT PC KOSPO KOSPO Finished (Oct. 2013 ~ Jun. 2016)
4 SAMCHEOK GREEN POWER UNIT 1,2 (1,000MW x 2) Korea AHU&ACCU : 2 sets P KOSPO Hyundai Finishted (Jun. 2013 ~ Apr. 2015)
3 HDO NEW BOILER #9 Project Korea FAN(Roof, Wall) : 7 sets, Louver : 13 sets PC HDO Hyundai Finished (Dec. 2013)
2 HDO NEW BOILER #2 Project Korea AHU(38RT) : 1 set PAC & Split A/C(1RT ~ 15RT) : 34 sets Fan(Wall, Duct in line) : 25 sets P HDO Hyundai Finished (Jul. 2011 ~ Feb. 2012)
1 HDO NEW BOILER #8 Project Korea PAC & Split A/C(1.1RT ~ 15RT) : 17 sets, Fan(Wall, Roof, Explosion proof) : 20 sets, Duct & Damper, Bulk, Plumbing : 1 LOT PC HDO Hyundai Finished (Feb. 2011 ~ May. 2012)